| Titel: |
Titel:
Intermittent water supply (IWS) in Jordan, Current challenges and possibilities for mitigating the impact on network op- eration and water metering
|
| Autoren: |
Autoren:
Sheikh, Mousa, Miyahuna LLC Water Company, Amman, JORDAN, ORCID: 0009-0008-0924-4964Saleh, Nabeel, Water Authority of Jordan (WAJ), Amman, JORDAN, ORCID: 0009-0000-2231-3364 Gheniemat, Abdullah, Jordan Standards and Metrology Organization (JSMO), Amman, JORDAN, ORCID: 0009-0007-8454-5313 Banikhalid, Abdullah, Jordan Standards and Metrology Organization (JSMO), Amman, JORDAN, ORCID: 0009-0007-1070-0800 Steinbock, Jonas, ORCID: 0000-0001-9725-7424 Alle Autoren anzeigen (7) |
| Beitragende: |
Beitragende:
HostingInstitution: Physikalisch-Technische Bundesanstalt (PTB), ISNI: 0000 0001 2186 1887
|
| Seiten: |
Seiten:
31
|
| Sprachen: |
Sprachen:
en
|
| DOI: |
DOI:
10.7795/120.20260123
|
| Art der Ressource: |
Art der Ressource:
PTB: Projektbericht,
DINI: Report,
DataCite: Report
|
| Verlag: |
Verlag:
Physikalisch-Technische Bundesanstalt (PTB)
|
| Rechte: |
Rechte:
https://creativecommons.org/licenses/by/4.0/CC BY 4.0 |
| Datumsangaben: |
Datumsangaben:
Verfügbar:
2026-01-23
Erstellt: 2025-09-06 |
| Datei: |
Datei:
Datei herunterladen
(application/pdf)
2.6 MB
MD5 Prüfsumme: a968aadbd5cd01507d32c067d6fa2fe6 SHA256 Prüfsumme: 8441ffd4f74633d79be509e097a68825292e96287472e6d5f50ed8d25bda5c69 |
| Stichwörter: |
Stichwörter:
Intermittent water supply (IWS) ;
Water Hammer ;
Water meter installation requirements ;
Air release valves
|
| Zusammenfassung: |
Zusammenfassung:
This collaboratorive study identifies operational challenges on the water supply network in jordan caused by the intermittent water supply regime. Proposals for adapted network operation, water metering and installation are presented.
|
-OAR